Interior painting was finished this week, which includes the walls, ceilings, exterior doors, and clear sealing the wood window frames. There is one accent colour: a medium grey painted on the wall that separates the stairs on all three levels.
Tile installation began yesterday. Here's a photo of the wall tile in the basement bathroom:
Floor tile and preparation for wall tile in the upstairs bathroom:
Thursday, August 20, 2009
Friday, August 14, 2009
Cork Floor Completed
Thursday, August 6, 2009
Flooring and Finish Carpentry
Sunday, August 2, 2009
Concrete and Basement Painting
Exterior concrete work was poured this week, including the front walkway, window well, landing at the side entrance, and driveway pad. The remaining cement board panels have also been installed. The grey panels will be painted white to match the others - for some reason they did not ship pre-painted this time.
Priming is also finished in the basement. A coating was also applied to the ceilings to provide a smooth finish for painting (as the ceilings will not be textured). We are protecting the basement slab as we intend to leave it exposed and seal it as the finished floor.
Priming is also finished in the basement. A coating was also applied to the ceilings to provide a smooth finish for painting (as the ceilings will not be textured). We are protecting the basement slab as we intend to leave it exposed and seal it as the finished floor.